Industrial robot programming & integration
Program robots on the three controller families Indian plants actually run. Start with coordinate systems and the teach pendant; finish with a multi-robot cell integrated with vision, conveyors and safety circuits.
- Duration
- 12 weeks
- Lab time
- 60%
- Batch size
- 15
- Robot kinematics, coordinate frames and workspace analysis
- FANUC TP and ABB RAPID programming on the pendant and offline
- Digital and analog I/O integration, safety circuits to ISO 10218
- Conveyor tracking with encoders; 2D vision-guided picking
- Capstone: an automated pick-and-place cell from an industry brief